Government projects require a higher level of planning, communication and responsiveness to meet the demands of the municipality and the public which it serves. Gaskins has an extensive list of successful partnerships with municipalities throughout Georgia.

"I have been absolutely satisfied with the performance and fees of Gaskins. We started using a couple of bigger name transportation engineering firms at first. They were not only terribly expensive and slow but didn't seem to be able to listen to what we needed to do. Gaskins came in and got us back on schedule and within budget. They understand the real world and what local officials have to deal with. I warmly recommend them to anyone in need of civil engineering services."

Mark E. Chastain
Gilmer County Commission Chairman



Project / Client Description Engineering Surveying Planning Const. Mgt.
Big Shanty Park
Cobb County Parks and Recreation Department
The project was an expansion of the existing park facilities with the addition of four tennis courts, adjacent to the tennis courts at Kennesaw Mountain High School. The challenge in this the project was to be able to have ADA accessibility to the courts from the high school parking area, as well create a feel that the courts could be operated together.
Catoosa County Sewer Main outfall
Catoosa County, Georgia
Construction plans included approximately 15,000 l.f. of sewer main line along the right-of-way of GaDOT highways and Catoosa County right-of-ways. Design included coordination with TVA transmission lines as well as county and state officials. Sewer line was designed to be installed to service existing neighborhoods that were currently on septic systems that were all in failing states or under capacity. Design included site specific specification, budgeting, scheduling, and other construction administration services.
Cedarcrest Road Cooridor Study
Paulding County DOT
Gaskins completed a preliminary study to improve the alignment for 6 miles of Cedarcrest Road. The project included ground-run photo control, right-of-way management, and civil site design of the proposed centerline.
Cedarcrest Road Intersection Improvements
Cobb County DOT
The project included intersection improvements and 0.5 miles of roadway improvements as part of a Cobb County TIP state funded project that included improvements to SR 3 (US 41). The design included roadway widening, stormwater design, utility relocation, and signage and striping.
Cedarcrest Road Widening & Utility Realignment
Paulding County DOT
This project consisted of the realignment and widening of approximately 4,600 l.f. of existing county roadway, from a rural two lane roadway to a divided median urban roadway. The right-of-way increased from 50 to 100 feet. The design included horizontal and vertical alignment, grading, storm water drainage, and erosion control. The project also included the replacement of existing water line with a 12" main and Gaskins provided construction oversight.
Chastain Meadows Regional Detention Facility
Cobb County
The project consisted of the construction of a dam 18 feet high, 1,000 feet in length along Noonday Creek. Gaskins provided control points for surveying during design and construction. A field run topographic survey was created of existing conditions for design and it was continuously updated during construction to balance the earthwork. Staking was provided for a sewer outfall relocation, grading, access roads, creek relocation, and an outlet control structure. Finally, an as-built of the dam and utilities was created.
Cherokee County Airport
Cherokee County
The project included surveying for the expansion of the taxiway. Gaskins provided staking for clearing limits, grading, ponds, stormwater system, and taxiway layout.
Clarkdale Historic District Streetscape Project
City of Austell & Clarksdale Neighborhood Associations
This project consisted of 5,700 linear feet of streetscape improvements, including the installation of sidewalk for a pedestrian walkway, driveway upgrades, stormwater drainage design, lighting and erosion control.
Clear Creek Recreation Complex
Gilmer County BOC
This project consisted of a 25 acre recreation facility, which includes 92,000 CY of cut for mass-grading, 1,000 linear feet of private drive, parking lot with more than 200 spaces, one multi-use field, four baseball fields with walkways, and a building site for a future gymnasium. The civil site design used vegetated storm water ditches to limit the amount of pipe needed for storm water conveyance. Gaskins provided construction administration and management from planning to construction, including NPDES monitoring.
Cobb Safety Village Park
Cobb County
The facility is an interactive, state-of-the-art environment to educate children about traffic, pedestrian and fire safety. Gaskins developed a site plan that features miniature electric cars on scale-sized roads with sidewalks, crosswalks, railroad crossings, and residential and commercial areas. Gaskins also incorporated prominent County landmarks to give the site a unique and local feel.
Dobbins AFB
U.S. Airforce
Gaskins has provided a variety of surveying services spanning many years on a base that occupies over 1,900-acres. Examples include a topographic survey 200 feet wide of a runway to repair a failing storm water system; a topographic survey of a 2 acre dam before and after construction; and staking the location of the localizer and check points at the end of a runway.
Dunwoody Sidewalk Project
City of Dunwoody
The project consisted of 5,000 linear feet of new sidewalk design along existing city streets. This project included a topographic survey which was used as a base map for the design. The design then was closely coordinated with the City of Dunwoody Public Works Department, and the design was done to work around existing utilities and landscaping as much as possible in order to facilitate a close cooperation between the City and the citizens impacted by the installation of the proposed sidewalks.
East Cobb Baseball Complex
East Cobb Baseball, Inc.
The 30 acre project included the development eight ball fields, two restroom and concession areas, batting cages, maintenance buildings, and parking. The design included boundary and topographic surveying, site layout, utilities, stormwater management, grading with retain wall layouts, and erosion control.
Gilmer County Fire Department #12
Gilmer County BOC
The design of the fire station site included the building layout, parking, driveway with 1,000 foot access road, septic sytem layout and specifications, and erosion control.
Gilmer County Fire Department #6R
Gilmer County BOC
The project consisted of the site layout for a fire station, convenience (waste and recycling) center, playground, and walking trail. The services included construction staking.
Graves Road Cooridor & Utility Realignment (FM & Reuse)
Paulding County
The project included a 2,800 linear foot shoulder expansion to an existing County road. The design included both water and sanitary sewer force mains, road design, and erosion control.
ISO Drafting Analysis
Gilmer County BOC
Project included working with Gilmer County Fire Department to locate, measure and assess 52 different drafting locations for the purpose of providing a county-wide map showing the extents of available fire suppression. The final study and map was used by Gilmer County Fire Department in their submittal to ISO to improve the County Fire Rating for property insurance purposes.
Lower Pumpkinvine Creek SSOF & LS
Paulding County
This project was a 12,000 linear foot sanitary sewer collector. The scope of services included sanitary sewer design, basin capacity study, erosion control design, topographic and boundary surveys, construction plans and specifications, easement preparation and acquisition, bidding services, construction administration and observation. The design included a 12,220 foot 54" outfall, 474 foot 15" outfall, 362 foot 8" outfall, both aerial and underground stream crossings, as well as coordination with an existing creek and wetlands.
Ridge Road Waterline Extension
Paulding County Water System
The project consisted of 18,000 linear feet of 24" transmission water line to a booster pump. The services included topographic survey, construction plans and specifications, easement preparation and acquisition, construction administration and observation, and construction staking.
Upper Westbrook Creek SSOF
Paulding County Water System
This project was a 5,500 linear foot sanitary sewer collector. The scope of services included sanitary sewer design, basin capacity study, erosion control design, topographic and boundary surveys, construction plans and specifications, easement preparation and acquisition, bidding services, construction administration and observation. The design included a 1,670 foot 30" outfall, 2,570 foot 24" outfall, 1,220 foot 18" outfall, both aerial and underground stream crossings, as well as coordination with an existing creek and wetlands.
Westside Parkway Pocket Park
Cousins Properties
The engineering design of this 3/4 acre park in the City of Alpharetta included layout, grading, and erosion control. Although privately funded, great effort was made coordinate with City officials in order to meet the needs of the Parks and Recreation Department and preserve trees.
Yukon Road Widening & Improvements
Gilmer County BOC
The project included the widening of 4.5 miles of main collector road with the addition of 6 feet of pavement and 6-foot-wide grassed shoulders. Other improvements included the re-configuration of a major intersection and school entrance, and the installation of guardrail. The field work included a topographic survey and right-of-way management. Gaskins provided the construction administration and management from the initial bid through construction oversight, including NPDES monitoring.